extraordinary maintenance intervention

Parish of St. George the Martyr, Birbesi (MN), June / July 2013

BELLS

On the bell tower there are n. 5 bells, by the following features:

I ° Campana 91,5 cm diameter, weight 420 kg, cast in 1836 from Foundry Cavadini

II Campana 81,5 cm diameter, weight 293 kg, cast in 1836 from Foundry Cavadini

Campana III 73 cm diameter, weight 213 kg, cast in 1836 from Foundry Cavadini

IV Bell 64 cm diameter, weight 138 kg, cast in 1952

V ° Campana 56 cm diameter, weight 98 kg, cast in 1946

 

MAINTENANCE OF INTERVENTION

Mechanics: The restoration work began with the lowering, using a special crane, the five bells and transportation to our company for the execution of the restoration. Specifically, the first phase included the cleaning of all the bells sweet blasting through non-invasive technique.

 

manual cleaning Birbesi bell

 

Because of the extreme hardness of the old clappers, wherein all the bells presented of very worn abutment points (more than 10% of the thickness of the abutment of the bell caliper), it is proceeded with the replacement of the same with new hand-forged , according to the traditional technique, complete with double safety cord.

The five strains are completely disassembled and overhauled, subsequently, they are subjected to a thorough cleaning by sandblasting and finally painted with high enamel protection.

The five wheels are subjected to modification in order to be adapted to the chains. Even for the wheels proceed with sandblasting intervention for their cleaning and subsequent coating with a special paint.

Four of the lower bells (IV, V, VI and VIII) presented themselves very unstable in the isolator component, with a significant risk of integrity and security.

The insulators, very worn out, they are replaced in order to ensure the integrity and safety of these bells. New insulators are composed of seasoned top quality oak, to which must be added the entire supporting hardware.

hardware nuiova Birbesi

 

 

 

 

 

                forge Birbesi hardware     new Birbesi insulators

 

the castellatura also support the bells it has been subjected to a thorough review. Indeed, it appeared with a strong oxidation due to poor maintenance carried out over the years and the ravages of time and the guano deposited on the same. Removing the top layers of dirt and acting with brushes and manual grinding wheels for the removal of oxidation layers, it is shown the structure to a new life, ending with the operations of painting operation with a high power passivation oxide micaceous iron in the shade chosen by the customer, with a natural wax finish.

All mechanical components are reassembled at the end of works using a special crane.

 

 

 

 

 

 

 

Birbesi painted components

 

power: Care was taken to the installation of the innovative plant for the latest generation RCTouchBell bells, handling plant for more advanced bells in the world, able to reduce fuel consumption and improve performance ensuring a protection from electrical phenomena and power surges. Product we produce.

The motors, which in the process of sopraluogo seemed to be able to guarantee their functioning also only subjecting them to a complete overhaul, are results, during the working phase, in part to replace. It is in fact proceeded with the revision of only two motors, while for the other three was carried out directly with the replacement. Even chains have been completely replaced.

 

Work performed in accordance with safety regulations and impiagati materials.